Project:  Two Rivers Medical Centre, Ipswich, Suffolk


  • Order Value:  £130K

  • Start Date: November 2015

  • Completion Date:  June 2016

 

  • Client: Apollo Capital Projects Development

  • Main Contractor: Barnes Construction

  • Architect: KLH Architects

 

Project Brief


To supply and install Omnis Exteriors SpeedDeck secret-fix curved standing seam insulated roof system, Rockpanel Woods 8mm rainscreen façade and Rockpanel RockClad 8mm rainscreen to front entrance canopy fixed utilising a Tack-S adhesive system onto a PlasteStrip FastFrame aluminium bar and bracket system, Trocal single-ply membrane to entrance canopy roof including associated rainwater goods.

This project required onsite rolling of the SpeedDeck secret-fix standing seam topsheets due to the location and access to the site, it was a highly successful venture due to great co-ordination between ourselves, Barnes Construction and the Omnis Exteriors site rolling team, these sheets were rolled at ground level then hoisted to the roof to achieve a seamless length of sheet running from ridge to eaves, with the great attention to the detailing for airsealing the building passed with a great rating.